Loose parts in.Line-ready kits out.Industrial kitting, labeling and repack support for Michigan manufacturers

We convert customer-owned components into controlled, labeled, production-ready kits — through documented work instructions, verified counts and inventory reconciliation.

Serving
Southeast Michigan
Material
Customer-owned
Records
Every lot
Kit layout drawing for a bracket-mount hardware kitFive component types laid out with numbered callouts and a bill of materials. Scrolling the page walks the kit through receiving, count verification, BOM confirmation, first-piece approval, bagging and labeling, inspection, inventory reconciliation, and staging for shipment, while a production traveler signs off each step.1234ABCDE12345x4x8x4x2x6RECEIVEDLOT 24-0817 / PO ON FILELot 24-0817 reconciliationReceived2,412Consumed into 100 kits2,400Rejected4Scrapped0Remaining, returned to stock8Variance0KIT 041724 PCS / LOT 24-0817100 KITSLOT 24-0817FIRST PIECE: HOLDFIRST PIECE: APPROVEDIN-PROCESS: 3 OF 3 PASSLOT RECONCILEDSTAGED FOR PICKUPBill of materialsITEMPART NO.DESCRIPTIONQTY1HB-0830Hex bolt M8 x 3042FW-08Flat washer M883HN-08Hex nut M844BR-114Mounting bracket25PC-06Push clip6Pieces per kit24Production travelerReceiveLot 24-0817Verify count0 pcsConfirm BOMRev C approvedFirst pieceApprovedProduce0 kitsInspect0 of 3 passReconcile0 varianceShipStagedTITLEHardware kit, bracket mountKIT NO.0417CUSTOMERSample drawingPREPARED BYBatchRight IndustrialREVCSHEET1/1

Eight steps. The same on every job.

Follow one sample kit through the process. The traveler on the drawing signs off each step as you go.

Skip the walkthrough
  1. Step 1: Receive customer-owned material

    Incoming material is logged against the shipment or purchase reference before anything else happens.

  2. Step 2: Verify quantities and condition

    Received quantities and physical condition are checked and recorded before material enters the process.

  3. Step 3: Confirm the approved bill of materials and revision

    Work proceeds only against the current, approved bill of materials and revision level for that part or kit.

  4. Step 4: Approve the first completed kit

    A first-piece sample is built and reviewed against the work instruction before full production begins.

  5. Step 5: Perform controlled counting, assembly, packaging and labeling

    Production follows the visual work instruction, with revision control maintained throughout the run.

  6. Step 6: Complete in-process inspection checks

    Scheduled checks during the run catch issues before they reach a full lot.

  7. Step 7: Reconcile inventory

    Received, consumed, rejected, scrapped and remaining quantities are reconciled and reported at close.

  8. Step 8: Ship or stage for pickup

    Finished kits are packaged, labeled and staged per the customer's shipping or pickup instructions.

Every lot comes back with its records.

You can audit what was done instead of taking our word for it. These are the records a typical kitting run produces.

  • Lot count record

    The counted quantity for each lot, the count method, and the scale reference used.

  • Label verification log

    Every applied part number, lot code and barcode checked against your specification.

  • First-piece approval

    The first completed kit, reviewed against the work instruction before the run starts.

  • Reconciliation report

    Received, consumed, rejected, scrapped and remaining quantities, reconciled at close.

Start with one part family.

Every new part family starts with a scoped, paid pilot: one defined kit, a limited quantity, an approved work instruction, and a joint results review before anyone commits to recurring production.

Pilot scope sheetOne part family

Scope

  1. One part family or defined kit
  2. Limited production quantity

Prepare

  1. Approved work instruction
  2. Clear pricing and assumptions
  3. Defined turnaround

Run

  1. First-piece approval
  2. Production reporting
  3. Inventory reconciliation

Review

  1. Results review
  2. Decision on recurring production