A documented, repeatable workflow
Every job follows the same eight-step process, regardless of size. The goal is a controlled, traceable record of what came in, what was done, and what went out.
What backs up the process
Approved bills of materials
Work is performed only against a current, approved bill of materials for each part or kit.
Visual work instructions
Each job runs from a documented, visual work instruction rather than verbal direction.
First-piece approval
Production does not proceed at volume until a first completed unit has been reviewed and approved.
Revision control
Work instructions and bills of materials are tracked by revision to prevent work against an outdated spec.
Lot traceability
Material is tracked by lot from receipt through completed, labeled output.
Label verification
Applied labels are checked against the specification before release.
Production travelers
A traveler record accompanies material through each step of the process.
Nonconformance controls
Material that fails inspection is identified, contained, and kept separate from conforming output.
Final inventory reconciliation
Every job closes with a reconciliation of received, consumed, rejected, scrapped and remaining material.
BatchRight Industrial's operating system is being built around these controlled-document and quality-management principles. BatchRight Industrial does not currently hold ISO 9001 or other third-party quality certification.